Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   2608   2609   2610   2611   2612  [ 2613 ]  2614   2615   2616   2617   2618   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Spad XIIIBuild05-Oct-08 20:22
Views : 1050
One more section to cover on the belly of the fuse. Methinks I will also add the landing gear.
John M OshustManzanoLaser Spad XIIIBuild05-Oct-08 20:20
Views : 955
Well we have a compled nose and cowl.
frankpGuillows Series 200 - SE5aBuild05-Oct-08 20:01
Views : 1417
This is all I got done today, had to take betterhalf out to see our favorite band, O.K. john how do i contact James. and Jack it calls for a sp400 with a 2.33:1 gearbox, Tower Hobbies has a gws EPS-400c which is a 400 motor and a 2.38:1 gear box, Thats wh
John M OshustManzanoLaser Spad XIIIBuild04-Oct-08 22:26
Views : 1024
The master plan. Totally finish the fuse. MGs, LG, and paint. Then build the wings.
frankpGuillows Series 200 - SE5aBuild04-Oct-08 22:25
Views : 1473
Got a building board today and got the front box glued together, found the radio but not the rx, need to order the rx and the motor for this. these laser cut parts are really nice much better than the die crunch.
John M OshustManzanoLaser Spad XIIIBuild04-Oct-08 22:23
Views : 1085
I hope to have the cowl and nose finished tomorrow.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Spad XIIIBuild04-Oct-08 22:21
Views : 1063
I think I found the handle for the cowl. I got most of it roughed out this PM.
SteveMGuillows Series 400 - P-51 MustangBuild04-Oct-08 17:23
Views : 1428
I haven't quite figured out yet how to best link up the rear wheel as the little arm for it moves not just in the X-Y plane but also a little in the Z plane. My best ideas so far are to either use an elastic material or a pull-pull.
SteveMGuillows Series 400 - P-51 MustangBuild04-Oct-08 17:20
Views : 1465
The motor is mounted and stringers are starting to go on. If you look close you can see push rods for the rudder and elevator.
simpleflyerGuillows 1903 Wright FlyerBuild04-Oct-08 16:21
Views : 7559
Elevator and rudder assembled. Fuselage frame started. Looks like we will meet our 12-17-08 deadline.
John M OshustManzanoLaser Spad XIIIBuild04-Oct-08 11:07
Views : 1117
Jack....these rings...installed. If you can point me to a site with paint schemes for Spad XIII plese do so johnmoshust.att.net
John M OshustManzanoLaser Spad XIIIBuild04-Oct-08 10:49
Views : 1080
Jack....Problem solved. I made a plate, fabircated radiator louvers, and installed a screen. The rings will glue on to this plate.
Page (3344 in total) :  <<   2608   2609   2610   2611   2612  [ 2613 ]  2614   2615   2616   2617   2618   >>  [ < Prev ] [ Next > ]