| Hangar |
Aircraft |
Category |
Date |
Preview |
| rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:45 |  |
| Views : 986 |
| Another view of the jig and clamps. My "other hobby" is woodworking and one of the truisms from that avocation is that you can never have enough clamps. |
| rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:43 |  |
| Views : 1070 |
| Longerons and formers mounted on the alignment jig. Got Clamps? |
| rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:41 |  |
| Views : 1002 |
| THis is the jig that I made to insure the alignment of the longerons. The longerons actually change elevation from the main spar back to the final former by about 7/16", thsu the jig. |
| rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:38 |  |
| Views : 994 |
| It tool me a while to get the features on this site figured out and Jim had to change something for me to get in. That being said, I ve actually been working on this thing for about a month, so there will be lots of pictures intially. Here are all of the formers, of 1/8" ply except for the main wing spar which is 1/4' BAltic Birch ply. Cut them out on my bandsaw and sanded them round on my spindle sander. |
| rayl | Scratch Built Consolidated XF-92A | Build | 08-Jan-15 16:33 |  |
| Views : 1125 |
| Hi All. I'm going to try to build this thing. The plans were in the 1954 Air Trails Model Annual. I got them from the Outerzone site. It will be scaled at 3/4"-1ft. to match the Guillows kits. |
| Don C | Dave Diels Engineering, Inc Plan #59, Curtiss C-46 Commando | Build | 07-Jan-15 14:16 |  |
| Views : 902 |
| Working on the bollom side now. I'm beginning to see an assembly problem getting the wings into the fuselage. Bill Parker, do you thhink your method would work? |