Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   900   901   902   903   904  [ 905 ]  906   907   908   909   910   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
Don CDave Diels Engineering, Inc Plan #59, Curtiss C-46 CommandoBuild10-Jan-15 15:30
Views : 932
Tail feathers squared away, but the center section of the wing is an excederin headache.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Jan-15 14:53
Views : 793
Well now that is as cold as a frozen elk teat in Siberia, it is time for tinkering in the model shop once again. Vacuumed the floor and started looking for both my thoughts and model parts. At least I have found the Gumster. Working on the cockpit interior. Happy New Year!!!
OLD A&PGuillows Series 800 - Spirit of St LouisParked10-Jan-15 12:01
Views : 1197
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:08
Views : 954
After a cup of coffee and muttering a few choice phrases, I tried my luck on the lathe again: success! I had to laminate a poplar wood blank to make the Afterburner cone due to it's height. Turned out pretty good if I say so myself. THese will be attached later after all the planking is completed and the Exhaust duct/flame-holder has been fabricated and installed.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 10:00
Views : 1000
The finished master with my first attempt at forming the canopy. This is a totaaly new process to me: SLip the form into a soft-drink 2 liter bottle that has been cut off at both ends then apply heat from a heat gun and teh plastic magically shrinks the shape of the master. Cool!
raylScratch Built Consolidated XF-92ABuild10-Jan-15 09:57
Views : 937
Next project is to carve the master for the canopy. I used Basswod that I picked up at the local big-box home improvement store. This is a progress shot about a 1/2 hour into the process.
Hangar Aircraft Category Date Preview
raylScratch Built Consolidated XF-92ABuild10-Jan-15 09:54
Views : 970
Here are completed main gears. They need to be cleaned up a little now. The grand plan is to leave these in this form until I have them mounted in the airframe and trued up then I will guzzie them up with plastruct tubing and othe do-dads to give them the correct appearance.
raylScratch Built Consolidated XF-92ABuild10-Jan-15 09:49
Views : 895
It's getting interesting now. The main L/G of this A/C has a main support axle with 4 struts attaching it to the oleo strutt. Each of the strutts is at a different angle and lenght. I made the jig shown to be able to make sure that the gears are identical. The gears are made of various sizes of brass tubing silver solderd together.
David DuckettDumas Kit #233. MiG 17Build09-Jan-15 23:42
Views : 4495
A more scale like stabilizer
julinickGuillows Series 2000 - B-29 Super FortressBuild09-Jan-15 19:02
Views : 1414
raylScratch Built Consolidated XF-92ABuild09-Jan-15 13:12
Views : 1047
Here is the nose gear well that has been fabricated within the inlet duct. It has been really hard to find good detail photos of some areas of the A/C, so there ia a little "Imagineering" going on here. I also laid on five planks on the bottom of the fuse to keep everything lined up. I did not want to apply any more planks that this as I need to keep the main L/G well area open for fabrication.
raylScratch Built Consolidated XF-92ABuild09-Jan-15 13:06
Views : 953
Impatience strikes! I just had to start fairing the planking to see how it was going to turn out. My little Stanley planes, which are older than I am, worked just fine once they were set a little deeper that what I normally have them. The soft balsa requires a more aggressive approch than pine or hardwoods.
Page (3344 in total) :  <<   900   901   902   903   904  [ 905 ]  906   907   908   909   910   >>  [ < Prev ] [ Next > ]