Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   881   882   883   884   885  [ 886 ]  887   888   889   890   891   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild10-Feb-15 15:30
Views : 720
Hopefully Gumby will be finished removing ices and snow from our drive and help assemble the fin and rudder tomorrow.
rgoodScratch Built Handley Page HeyfordBuild09-Feb-15 21:08
Views : 1095
David DuckettDumas Kit #233. MiG 17Build09-Feb-15 18:32
Views : 4633
The view from the rear shows the clear plastic tail cone painted with enamel.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Feb-15 15:48
Views : 765
When I choose an aeroplane to model I try to find something unique to that aeroplane’s design.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Feb-15 15:47
Views : 717
With “Ogre” there were a number of unique components that peaked our interest. I was drawn to the unique engine, Gumby to the strange tailskid. Without the benefit of actual close up photos the Gumster and I have been pondering the tail skid fabrication for quite a while.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aFlying09-Feb-15 15:46
Views : 805
Today we got down to business and Ogre has a skid to support his empennage.
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Feb-15 15:46
Views : 766
With the painting process still underway, we work toward the framing of the air foils, AKA, wings.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Feb-15 15:45
Views : 752
We shall slow our pace, construct the center wing section over the cabane struts, fabricate a Lewis gun or two, mount them, add a bit of detailing to the fuselage, then address the wing issue.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild09-Feb-15 15:44
Views : 798
If we are lucky it will be spring and the wings can , “wait in the wings”, until next winter!!
raylScratch Built Consolidated XF-92ABuild09-Feb-15 10:27
Views : 1047
Here is the first test fit; not bad. I will CA a ring of fine solder to the small end to ensure that it remains circular and give it a little strength.
raylScratch Built Consolidated XF-92ABuild09-Feb-15 10:25
Views : 992
All shrunk down and ready to trim it out.
raylScratch Built Consolidated XF-92ABuild09-Feb-15 10:24
Views : 931
I had a little time in the shop yesterday while the LOML was shopping, so I thought that I would do another "Shrinky-Dink' for the Afterburner tail piece. Here is the portion of the Coke bottle over the form before applying heat to it.
Page (3344 in total) :  <<   881   882   883   884   885  [ 886 ]  887   888   889   890   891   >>  [ < Prev ] [ Next > ]