Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3324 in total) :  <<   72   73   74   75   76  [ 77 ]  78   79   80   81   82   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
bsadonkillGuillows Series 400 - BF 109Build14-Mar-22 08:26
Views : 526
A little marker magic.
bsadonkillGuillows Series 400 - BF 109Build14-Mar-22 08:25
Views : 589
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:42
Views : 1581
Started building this in late 2020, and lots of other stuff in between. I was able to complete the covering this weekend. Sneak preview, more work to go. Many cool color schemes for the P51, but it was an easy decision to honor the colors of the Tuskegee Airmen.
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:41
Views : 1527
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:40
Views : 1384
TJHGuillows Series 400 - P-51 MustangBuild13-Mar-22 19:40
Views : 1582
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:29
Views : 375
Fully retracted from the top.
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:29
Views : 433
Fully retracted
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:28
Views : 348
Gear partially retracted.
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:28
Views : 329
Gear fully down from the top as if looking into the engine nacelle.
edtherendermanCleveland Westland WhirlwindBuild13-Mar-22 18:27
Views : 315
The landing gear is another engineering challenge. I was able to find an original drawing of the landing gear configuration, which was really helpful. I didn’t understand how the supporting struts worked until I found it. So I spend several evening trying to create the struts using brass and copper tubing, but realized I could 3D print them with enough detail and strength to work. I had already cut the gear doors out of one of the nacelles and was able to use that as a rig. After getting everything working, I created a test rig out of bamboo skewers for to build the other side. Here is the gear in fully down position.
mark eggebeenGuillows Series 2000 - B17 Flying FortressBuild11-Mar-22 11:14
Views : 689
I have read the instuctions on the card..I have coated the card stock and have a piece of clear . .Now. I need some step by step to get me through the rest of this and ready to glue up.
Page (3324 in total) :  <<   72   73   74   75   76  [ 77 ]  78   79   80   81   82   >>  [ < Prev ] [ Next > ]