Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (3344 in total) :  <<   3073   3074   3075   3076   3077  [ 3078 ]  3079   3080   3081   3082   3083   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
moostang51Guillows Series 2000 - B-24 LiberatorParked01-Jul-07 18:21
Views : 2344
A few possible paint schemes. Jerk's Natural is the detailing provided by Guillow's. I like the Green Dragon at the bottom. Lot's of masking though.
moostang51Guillows Series 2000 - B-24 LiberatorBuild01-Jul-07 17:53
Views : 2553
Little bit more of everything, some nacelles and partial fuselage covering. Rudders still in progress, going with solid carved main and tissue covered flap.
John M OshustScratch Built MiG3Aerial01-Jul-07 14:41
Views : 1246
The contol room if a submarine, the instrument panel, if a plane. The detailing begins.
jgoodGuillows Series 200 - Fokker DR-1 TriplaneBuild01-Jul-07 10:34
Views : 1801
Topwing aileron actuators. The ailerons are glued to the metal rod, and pushing and pulling the end of the torque rod moves the aileron up and down.
jgoodGuillows Series 200 - Fokker DR-1 TriplaneBuild01-Jul-07 10:30
Views : 1723
Showing the lightened horizontal tail feathers. They will be operated by a pull-pull cable system, for maximum lightness.
David DuckettGuillows Series 800 - B-25 MitchellBuild01-Jul-07 07:32
Views : 12580
For Doodle- use hinges. This is the method Guillows uses and it's common for all their kits. A different method is used if the control surfaces are to be functional, that is for a flying model.
Hangar Aircraft Category Date Preview
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild01-Jul-07 06:46
Views : 5143
Sheeting the nose section begins next
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild01-Jul-07 06:46
Views : 4405
Wings are built - butt joint to fuselage
John M OshustScratch Built MiG3Build30-Jun-07 20:55
Views : 1263
Boris misses his Camel, but likes the "New Ride!"
John M OshustScratch Built MiG3Build30-Jun-07 20:54
Views : 1184
Gentlemen remember me? We are 40 hours into the scratch built Mig-3. My Boss says that now the "fun work" of detailing the fuselage will begin. This is a modified Mig published by E Sthal in 1943. Larger scale, bass, not balsa.
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloParked30-Jun-07 06:19
Views : 4533
It took about 2 hrs to add all the stringers.
jernstDave Diels Engineering, Inc Kit #30, Brewster F2A BuffaloBuild30-Jun-07 06:18
Views : 1562
This is my current project. Span is 17.5 in. Stab is two piece that fits into slots at the rear keels
Page (3344 in total) :  <<   3073   3074   3075   3076   3077  [ 3078 ]  3079   3080   3081   3082   3083   >>  [ < Prev ] [ Next > ]