Hangar |
Aircraft |
Category |
Date |
Preview |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:46 |  | Views : 869 | |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Parked | 08-Nov-21 14:45 |  | Views : 951 | Finished |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:38 |  | Views : 982 | One more light application of spackling will be added and then sanded smooth which will make it all ready to dope. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:35 |  | Views : 883 | adfter drying overnight, sand with 220 wet/dry sandpaper. Two applications are needed for such shapes. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:33 |  | Views : 861 | The space between the fuselage and wing were filled with scraps and the pattern taped. |
David Duckett | Dave Diels Engineering, Inc Kit #27, Nakajima Ki27 Nate | Build | 21-Oct-21 18:32 |  | Views : 847 | Wing infill is 1/16' stock bottom, 3/32" top |
|
|