Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (32 in total) :  <<   16   17   18   19   20   21   22   23   24   25   26   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 15:11
Views : 497
Productive day. Stormzilla tracked farther to the east. We were spared stormaggedon, only 6 inches. Gumby put the finishing touches on the cockpit. All it needs now is a windscreen.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 15:04
Views : 499
Just call Gumby “Tin Knocker” He covered almost everything before running out of petrol.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild27-Jan-15 10:37
Views : 479
Misson accomplished, only needs a windscreen.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:55
Views : 513
Well Gumby started the slow and tedious process of fuselage decorating. He wanted to accomplish more but I have him outside shoveling snow. With the amount of snow that is anticipated and the size of his snow shovel, he should be occupied for quite some time!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked26-Jan-15 14:54
Views : 483
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 14:53
Views : 450
Not completed but getting there!
Hangar Aircraft Category Date Preview
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild26-Jan-15 11:23
Views : 503
rayl...Maybe this will clarify the dashboard. A trip to a craft store for jewelry rings and rubber “O” rings for a bezel, instrument graphics, and nail polish to build up a lens.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild25-Jan-15 14:56
Views : 486
Let the decorating commence!
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 16:00
Views : 665
The Gumster antiqued the cockpit interior a tad. He cannot wait to cover the wood and install the coaming.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 15:58
Views : 488
The ventral surface of the fuse sheeting was completed.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aBuild24-Jan-15 15:57
Views : 489
Wood sealer was applied in preparation for covering.
John M OshustManzanoLaser Royal Aircraft Factory B.E.12aParked23-Jan-15 17:14
Views : 520
My little, “rubberized”, engineer has met the production goal.
Page (32 in total) :  <<   16   17   18   19   20   21   22   23   24   25   26   >>  [ < Prev ] [ Next > ]