Main Menu
User Login
User Name
Password



View By Aircraft
Users Aircraft

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (23 in total) :  <<   15   16   17   18   19   20   21   22   23  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
BarnstormerGuillows Series 200 - Nieuport IIBuild24-May-08 22:40
Views : 1008
Just to put it into perspective, the washer is sitting next to an 22cal round.
BarnstormerGuillows Series 200 - Nieuport IIBuild24-May-08 22:37
Views : 983
Working on the bolt fange, a washer from my junk box and small plastic bolts applied to simulate the bolt flange on the front of the crank case.
BarnstormerGuillows Series 200 - Nieuport IIBuild24-May-08 22:22
Views : 939
I finally started the leRhone. life has delt me a few challanges that slowed my modeling down. 100 deg. weather and an broke AC was the priority. Extra hours at work cut into build time, but I cant complain, it helped to pay for the AC parts. Well enough
BarnstormerGuillows Series 200 - Nieuport IIBuild27-Apr-08 21:36
Views : 1086
Sundays work, man I love these laser cut kits.
BarnstormerGuillows Series 200 - Nieuport IIBuild25-Apr-08 21:29
Views : 1147
Up next on the board. I will be doing the paint scheme in Italian colors.
moostang51Guillows Series 200 - Nieuport IIBuild29-Dec-07 14:58
Views : 2213
This was built in my college days circa '75/76 in between studying and calculating kips and moment connections in Engineering. Some Genesee Cream Ales or Rolling Rocks and a couple of bongs made for intenese model making even back then. Surprised the bui
Hangar Aircraft Category Date Preview
elevatoranjGuillows Series 200 - Nieuport IIBuild17-Nov-07 12:28
Views : 3100
I guess there is no such thing as a minor "touch-ups" with micro fill, fixed two small spots, then I fixed two more small spots and the next thing you know, the entire fuselage was covered.
elevatoranjGuillows Series 200 - Nieuport IIBuild11-Nov-07 15:16
Views : 3179
2nd try at the instrument panel.
elevatoranjGuillows Series 200 - Nieuport IIBuild10-Nov-07 14:51
Views : 3053
Been a long time since posting due to moving. Here's the Newport II in silkspan.
elevatoranjGuillows Series 200 - Nieuport IIBuild10-Nov-07 14:48
Views : 3153
Waited over 6 weeks for these "special ordered" spoked wheels. Had to make up a new axle shaft to accommodate the 1/32th inside diameter hub size.
elevatoranjGuillows Series 200 - Nieuport IIBuild04-Sep-07 00:37
Views : 3194
two trys with an X-acto inabout an hour. started the 1st one too thin
elevatoranjGuillows Series 200 - Nieuport IIBuild03-Sep-07 10:08
Views : 1205
10.5 hours of sanding and staining
Page (23 in total) :  <<   15   16   17   18   19   20   21   22   23  [ < Prev ] [ Next > ]