Main Menu
User Login
User Name
Password



View By Aircraft

Top Ten Aircraft :
(numbers in brackets represent number of images online)
Top Six Manufacturers :

Browse Images

Virtual Aerodrome Image Browser ( Small / Large ) Show : All | Parked | Flying | Build | Aerial | Reference
Page (10031 in total) :  <<   279   280   281   282   283  [ 284 ]  285   286   287   288   289   >>  [ < Prev ] [ Next > ]
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:21
Views : 760
Gear fully retracted in the Nacelle. Looking down into the top of the nacelle.
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:20
Views : 704
Gear doors closed. Doors where created using the piece cut out of the nacelle as a buck, then vacuum formed styrene over the buck. The styrene was supper thin and flexible, so I built up the insides with many layers of tissue and EZ-Dope. The outsides where filled with spackling compound, sounded, tissued, doped and painted with sanding primer. I still need to add small magnets to keep the doors together when closed.
Hangar Aircraft Category Date Preview
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:19
Views : 694
Inside of nacelle looking down. You can see the hinges for the gear doors. The tee pins will be replaced with hinge pins before installing the nacelle on the wing.
edtherendermanCleveland Westland WhirlwindBuild30-Mar-22 11:18
Views : 703
Did not estimate that it would take over a month of weekends and evenings to get the landing gear sorted, but here it is. Starboard landing gear down.
Page (10031 in total) :  <<   279   280   281   282   283  [ 284 ]  285   286   287   288   289   >>  [ < Prev ] [ Next > ]